National Applied Construction Products, Inc.
Proudly manufacturing confidence for over 35 years!
Home
CADdetails Microsite
Membranes
Companion Products
Technical
Architects
Gallery
About
More
Super SAM 125 Bathroom System
Bathroom Super SAM 125 System
Full bathroom system integrates Super SAM 125, SubSeal, seam tape and pre-formed fabric corners for projects requiring sound control and waterproofing protection
Bathroom Super SAM 125 System
NAC TAC primer is applied at the floor to wall joint first, then seam tape is installed and the Super SAM 125 is installed over the seam tape on the floor.
Bathroom Super SAM 125 System
SubSeal is applied to the walls and cures in about 2 hours for minimum down time prior to tile installation.
Bathroom Super SAM 125 System
The corner detail shows that SubSeal is applied to the corner, then the pre-formed fabric corner is inserted into the SubSeal and another coat of SubSeal is applied over the top of the corner.
Show More
Back